Monday, August 16, 2010

First comes wood, then comes steel..

...then comes a baby in a baby carriage....?!?

As we approached our house today, we saw that the crew was once again blocking part of Franklin.  Our steel was being delivered!  (And these are the steel beams that we will be keeping in our house, unlike those that were brought in for the temporary cribbing.)  While our steel contractors begin the installation of the steel today, our framing guys will be working at the same time.  It all sort of needs to happen magically at once....

This is clearly a huge milestone.  It's been 3 months of excavation and foundation work!  All that digging and wall making and concrete pouring turned out to be way more extensive than I thought it would be.  Hopefully, the framing phase will be a bit more predictable (especially if we don't make any last-minute changes), and we'll stay on track to finish the framing in 6 weeks.  We may not have a roof over our heads by the time the baby comes, but at least we'll have lots of walls around us!





Friday, August 13, 2010

The Hybrid Pulls Through Again

We spent another Friday night at Home Depot.  We needed to order some subflooring for Monday and also pick up some Tyvek.Yet again I doubted that the 9 foot long roll of Tyvek would fit in our car, but Emerson and his Hybrid proved me wrong again! 

Tuesday, August 10, 2010

Preparing for Steel

This morning, our steel guy, Richie met with Rick again to discuss the logistics of getting the beams in.  We've got a tight space, a good amount of steel going in, lots of framing wood laying around, and we'll still need adequate space for the crew to move around without getting hit in the head with steel.  So there's a lot of coordination that must occur in the next few days...







Monday, August 9, 2010

Wood'ya be my neighbor?

After all our hard work sourcing the wood last week, we finally had the first delivery of wood today!  I had to get to work by 8am, so I took BART because Emerson wanted to see the delivery in person.  This truck came all the way from Eureka (5 hour drive by car and who-knows-how-long by truck).  Apparently, he made his way to the Bay area last night and spent the night so he could be here early this morning.  Tomorrow he's actually coming back to drop off the other part of the delivery since the wood mill is still prepping those pieces.

Saturday, August 7, 2010

Our Other Extreme Makeover

As many of you know, this isn't the only extreme makeover we've been taking part in over the last few months.  Since March, we've been cleaning out our South City house...and for the past month we've been fixing it up.  However, unlike our Franklin project, we've decided to do most of the work ourselves.  So we've spent many week nights and every weekend at the house painting, pulling carpets out, installing new flooring, fixing toilets, etc.  Emerson has really impressed me with his handyman skills.  He fixed all the sinks, toilets, and installed new appliances in the kitchen!

Today, I actually got half the day off because Mom (who flew in from Vegas), Lara, Stephy, and Loan threw me a baby shower!  Before the festivities, Emerson and I made a trip to Lowe's at 8am to get some new flooring materials.  For the past 3 weeks, we hired a young couple off Craigslist to speed up the process by helping us paint and install new flooring downstairs.

The highlight of the weekend was definitely hanging out with Mom & Dad and our nephews & niece.  Here are Ben, Max, and Sam acting silly at the end of the evening...

Friday, August 6, 2010

Sourcing Wood

The crews are going to start framing next week (finally)...which means they'll need wood - and LOTS of it.  This week, Emerson has been working tirelessly to get the lowest bid on the wood.  He collected quotes from Home Depot, South City Lumber, and some place in Eureka.  We're hoping to get the lowest prices from SCL or Eureka so we can ask HD to beat them.  We worked with all the guys at the HD Pro desk to go over the bids line by line.  They also sent our request to their "bid department" that supposedly gives the lowest HD bids for bulk orders.  When we got that back, it was way higher than the SCL and Eureka quotes.  After a long and frustrating week (and lots of begging), we finally got HD to beat the lowest prices on the items they had in stock.  To add to the stress, we were on a tight timeline since we wanted the wood delivered on Saturday or Monday at the latest.  We sat at the HD Pro order desk on Friday night while Emerson went through the quote line by and line and put down the comparable quote from SCL or Eureka.  As each customer service guy ended his shift, we were still sitting there....until finally, they shut off the lights in the store, and we had to go home.  On Saturday, Emerson ended up ordering half of our first drop from HD Pro and the other half from Eureka.  Unfortunately, we've got 2 other drops after this one...but at least we know the drill next time.


Here's the result of our 3rd concrete pour today....An elevator pit!  (And they did a few small sections along our walls too.)


Wednesday, August 4, 2010

Elevator Pit Woes

Manny was working on the elevator pit this morning.  They're going to be doing another concrete pour on Friday.  (They'll be doing some more sections on the North and Southeast sides of the building in addition to the pit.)  We don't have the official shop drawings from our elevator vendor yet because we've been having some last-minute debates whether to go with a mini-commercial type elevator with sliding doors vs. the traditional residential elevator.  Thus, we gave them the dimensions of a larger pit in case we end up going with the sliding door elevator.  Here are the guys making sure the pit is deep enough.  And there's the "real" inspector below on the right (a.k.a. Emerson).