Wednesday, June 30, 2010

First Concrete Pour!

We finally saw some real progress today.  (All that rebar tying seemed to take forever!)
First Concrete Pour - Mat Slab for the Extension in Back
West Wall

Monday, June 28, 2010

South Wall Rebar

More Rebar Work: South Wall

Friday, June 25, 2010

...and continues...

Removing concrete from the old foundation on the North wall

Prepping for the garage floor slab

Monday, June 21, 2010

North Slab

More rebar work and prep for the concrete:
Sunken Patio Wall                      South Wall of Garage

North Side - Slab


Wednesday, June 16, 2010

Rear Addition - Rebar and Vapor Barrier

More progress on the rear addition.  The vapor barrier was placed down and all the rebar's in place.  Now we need to choose a plumber quickly so he can come in next week to put in the drainage pipes before the concrete pour.


Monday, June 14, 2010

Beautiful Architecture on Our Block (and it's not our house we're talking about)

The rebar for the foundation work was delivered on Friday (6/11).  We were excited to see this...We can't wait for our new foundation!  The guys continued to work on the addition out back.  Lots of work for a 368 sq ft (23x16) addition.  Good thing we're going up 4 floors, or that would be one expensive play room for the kids.


We're not the only ones making progress on the construction: our next door neighbor, Michael is too.  After many many months, they finally removed the scaffolding in front to reveal the newly painted facade.  Which one do you like better?



Here's a little bit of history on the Beaux Arts building:
This building of three splendid flats was built sometime after the 1906 earthquake by the Paris-educated architect James Francis Dunn. It is among the dozen most famous residences in Pacific Heights and has been mentioned in almost every book on the history of San Francisco architecture published since 1968.

Here Today: San Francisco’s Architectural Heritage:
“An unusually charming example of the fanciful Mannerist- Baroque, verging on Art Nouveau in wood and plaster, is 2413- 2417 Franklin Street, between Green and Vallejo Streets. The building, which houses three flats, was erected in 1902 [actually sometime between 1906 and 1916]. Numerous exterior ornamental details and intricate ironwork, especially the balconies and their traceried grillwork, express an animated turn-of-thecentury which proved quite influential in San Francisco. Particularly the unusual French doors and curvilinear overwindow are echoed throughout the city.” [page 22.]
Architecture: San Francisco: The Guide:
“One of the most elegant of Dunn’s essays in this imported Belle Epoque style.” [page 71]

Victorious Victorians: A Guide to the Major Architectural Styles:
“This Italianate has French Revival embellishments: lacework balconies and elaborate windows. The rusticated wood wall resembles masonry. The sculptural embellishments together with the dentils behind it function as a balcony corbel.” [page 30]
San Francisco. Building the Dream City:
“Designed by James Francis Dunn, [these] flats... the utmost in refined French style, with beautifully formed windows, Louis XV cartouches, delicate filigree balcony railings, and two strong male figures holding up the cornice.” [page 261]
The facade of the building was fully restored beginning in January 1987 over a period of more than a year, and repainted in 2007....and now it's been repainted again!



Friday, June 11, 2010

Bye Bye, Bobcat (for now)

When we visited the site early this morning, they were taking the Bobcat away.  There's still one left in the garage, but they needed to make more room to set up the foundation.  Hopefully, we won't need to see this one back, 'cause that would mean they were hauling away yet more dirt.  And we've already paid a lot to dump tons of dirt.



In place of the some of the dirt, they've hauled in a bunch of gravel.  They've laid this down in the rear addition in preparation for the concrete foundation.  They'll be pouring an 18" mat slab to serve as the foundation for the rear addtion.



Thursday, June 10, 2010

Getting Ready for the New Foundation

To date, they've leveled the entire site in the back to provide enough room to work.  The rear shows a temp retaining wall for holding up the remaining dirt that's against the neighbors foundation.   (Photos courtesy of Rick)
The red line sprayed in the dirt represents the back of the addition. The footing that's being excavated beyond is where the retaining wall is placed per plan.  However, the retaining wall might be pushed back to the temp wall.
We're confirming with our structural engineer today regarding some questions about the mat slab that will be put down.  In the mean time, the rebar should be delivered soon, so we will be ready for the concrete by next week!

Saturday, June 5, 2010

Beginnings of our Sunken Patio

I haven't been to the back of the building in days, so it was a spectacular sight to see.  The house looks like it's been raised off the ground since they've been excavating all that dirt it once sat on.
Views of the back of the house -
                                                   North wall              South wall
View from the garage of the South wall


Emerson and Rick are standing out back where the sunken patio will be.  The dirt line right above Rick's head is where the neighbors foundation stops.  (That area above there will be a small terraced backyard area.)  That dirt line is also the level where our backyard used to be.  Yes, they really did clear out a lot of dirt.

Thursday, June 3, 2010

The Excavation Continues

This entire week they've been excavating dirt out of the garage and the backyard.  They've already loaded what seems like an endless number of truckloads of dirt out of here...and they just keep going.  It's mostly just sand at this point, but there sure is a lot it.




These pictures don't really show much perspective on how much sand they've digged out of the garage.  Every day we come by, they measure the height of the garage, and it is never tall enough for those car lifts.  (It will be 12 feet high at the back of the garage.)  The cost of these car stackers is increasing at an exponential rate...We may have to buy another car just to make use of our 3 parking spots!  And then we'll have 2 more spots temporarily for guests, so don't forget to come visit when this is done.

Emerson is standing in the middle of the garage taking a picture of me standing where the garage door was.  When I posed for this picture he seemed really far down there...

Tuesday, June 1, 2010

Our House on Stilts

The crew will continue to excavate for the next few days, so we didn't make it to the job site this morning.  And the place was boarded up this past Saturday evening, so I didn't get any more good pictures.  But here is one from this morning, courtesy of Rick.  (There used to be some external walls in the back and on the side.)