Wednesday, July 28, 2010

Hoping we don't need 93 jacks...ever!

It's been a slow week since the crew is finishing up some sections of the foundation while getting ready for the framing to begin.

So I'd like to highlight a Pacific Heights mansion that is for sale right around the corner a half block away.  I'm showcasing this place not because of it's crazy listing price ($7MM) nor its availability as a rental ($26,950/month), but because I hope what happened to this house's foundation doesn't happen to ours!

1772 Vallejo St
  The Italianate mansion on Vallejo Street, with slanted bays and a Mansard roof, was designed by Edmund M. Wharff and built in 1875 as [Captain Ephraim Burr’s] wedding gift to his son, Edmund. During the 1906 earthquake, the house slipped off its foundations and ninety-three jacks were required to lift it back. As one of the best preserved residences of the period, it is a fine example of the transition of style in the later 1870's.


If you've been reading our blog, you'll know that we have spent a lot of time, careful planning (and not to mention a lot of money) on our new foundation, so we hope we survive the next BIG ONE...
Our favorite real estate blog, Socketsite:  http://www.socketsite.com/archives/2010/07/rent_versus_buy_or_sell_a_landmark_mansion.html
 
A bit of history:
http://www.socketsite.com/archives/2009/08/1772_vallejo_another_exmayors_landmark_mansion_coming_s.html
 
The Listing:
http://www.sfproperties.com/properties/1772vallejo/index.html

Monday, July 19, 2010

And At The End of the Day - Voila! Walls!

South Wall
We come back to our place later in the day to see our new foundation. Funny how something as mundane as concrete walls can get you excited, but after two months of starting our project this was a big milestone to look forward to. The guys had worked 10 hours pouring and shooting concrete to form the footings and walls and here are the results. 

Above is our foundation on the south side. Below is the other side of the garage. We had to make sure the garage was at least 17 feet wide to accomodate a pair of car stackers.
Stem Wall

Back of garage wall
Here's the back of our garage where it joins the stem wall. The cement poured all along the base of the walls is our foundation footings

The guys were scheduled to finish the north wall and retaining wall behind the yard, but due to all the finishing work that took place along with a slight malfunction with the shotcrete pump we'll have to complete the rest of the pours another day. All in all it was great to see us reach this milestone. Hopefully the coins embedded in the concrete give us luck going on.

CONCRETE!

We got to the job site at 7:15am today so we could throw coins in the foundation before the concrete trucks came.  We thought it was ironic that we were throwing our money away "in" the foundation this time....as if we have not been throwing our money away "on" the foundation all this time.  We shared a few laughs along with our contractor.  Rick asked if we wanted to throw the money in the actual concrete but the trucks hadn't arrived yet, so he said he'd watch the guys to make sure no one took the money out.  We assured him it wouldn't be worth their time because we were totally broke and had mostly pennies.  I found some Euros, Kroners, and other international coins, so hopefully this will bring us prosperity so we can travel around the world again!



For the foundation, they'll be using a combination of sprayed shotcrete (4000psi) and poured concrete (3000psi).  The inspector was there waiting for the concrete to be delivered.  I guess we don't have to worry about any Doritos wrappers, leftover breakfast, or bodies being thrown into the concrete.

We also did some (very) last minute planning for our waterfall out back.  Since we're forming a concrete wall along the perimeter of the sunken patio, we decided to put in a waterfall on that wall.  We were inspired by a house we saw as part of the 2009 AIA home tour.  Anyway, we didn't have CAD on hand, so we confirmed the placement and layout of the waterfall on some cardboard.
Our inspiration for the waterfall:  http://www.openhomesphotography.com/1223Bosworth/ 


Then we were off for an 8am doctor's appointment.  Afterward, we drove by on the way to work to check out the concrete trucks from Bode Concrete.  We poured around 20 cubic yards of concrete for the first slab.  Today, we'll be putting in around 57 cubic yards.  I guess our house will be prepared for the next big earthquake...

Friday, July 16, 2010

Fire Brick

We were hoping to pour the concrete Thursday or Friday (today) but that didn't happen.  The concrete guy would've had to make 2 trips so we just told him to come on Monday and do it all at once.  Thus, the crew had the day off from our construction site yesterday.  Today, the crew worked a few hours to get everything ready for Monday.

This morning we met with a brick layer to get some advice on our not-so-beautiful facade.  When Emerson had told him over the phone that our facade was made of fire brick, he didn't really believe us.  So when he came by he was actually a bit surprised because he's never seen a building made of fire brick before.  I don't know if that's good or bad...so I asked him if fire brick is just really cheap and maybe that's why we ended up with this facade.  He said no, if anything, it might be more expensive because it can withstand high heat.  (Fire brick is the brick they use to line fireplaces and kilns.)  I guess if we have a major fire, our not-so-beautiful facade will withstand the damage!  Anyway, he suggested powerwashing the brick first to see if we like the original color.  He scraped away some mortar and showed us that the mortar actually is the same color of the brick....and that already looked a lot better.  Then he suggested repairing just the part that need to be replaced.  We are able to see a small area of the original color of the brick/mortar, and it actually looks completely different.  We are hoping this will be a good solution for beautifying the facade instead of demolishing all the brick and starting new.  So right now, we're leaning toward cleaning and fixing the brick first.  If we don't like that look, then we'll look into painting the brick.  And if that turns out ugly, then we hope we win the lottery so we can redo the entire facade.

We're also working on making a decision on our elevator.  I thought we had our mind set on a residential elevator (it only took the past 7 months to pick out the right model and everything)...but now we're reconsidering a mini-commercial one with sliding doors.  Space is our biggest concern since the hoistway will need to be expanded...and we need to make sure we still have space for all those cars in the garage.  The second question is if we really need to invest in a high end elevator for a 4 story building with only a few occupants....This debate will continue for a bit.  But we'll have to make our decision within the next week or 2 so the hoistway can be framed.

Here are some pictures from today.  Everything's ready for the concrete pour on Monday.  The guys were sliding in a drainage sheet (for the bottom of the concrete) and Emerson offered to help.

Tuesday, July 13, 2010

When are we going to pour the concrete?!?

We started the day early today with a visit to the DBI instead of our construction site.  We were scheduled to meet Rick at 7:30 but security doesn't even let you go upstairs to the fire and building inspection counters until 8am.  So naturally, we were the first people to go upstairs when we got the green light.  No one was at the fire desk (oh, those govt workers) so we continued to wait...Basically we wanted to ask a few questions about our egress since we'll need to move the external staircarse around a bit.  We wanted to make sure our planned changes will be okay with the fire inspector since we're pouring concrete this week and it would suck to have to make changes later.  Turns out the guy at the fire desk said that we'd have to okay it with the building plan checker because he only reviews 3+ unit buildings.  We walked over to the building plan checker and he was busy doing some paperwork so he got annoyed when our "quick question" wasn't really quick.  He said to sign in and wait about 20 minutes if we wanted him to review the plans.  At that point, we had already figured out what we'll probably need to do to get past inspections....so we confirmed with Rick what the plan was for the concrete and we left.

We passed another city inspection today...and are waiting for our electric-UFER ground inspection.  Erevan will be coming on site again to doublecheck some structural stuff.  Tomorrow, Rick's going to use the extra day to make sure all measurements are correct and to doublecheck plans so we can pour concrete on Thursday.  Emerson has been asking him every day for the past month when is he going to pour the concrete!  I can't wait until that day comes, so at least I don't have to continue hearing him ask the same question...and then of course, he'll be asking, "When's the framing going to be done?"  Kudos to him for being the best project manager ever :)

Thursday, July 8, 2010

Still forming...

These pictures aren't much different than the ones I already posted.  The guys have continued to form the walls all week.  It's kind of hard to see the progress since it's become a maze of rebar and boards.  We have a full crew on board though, and I guess this is just what it takes to make a new foundation.  We were hoping to have our second concrete pour tomorrow (Friday), but that isn't gonna happen. We're trucking in lots and lots of concrete so we'll need to make sure everything is in the right place.  We're shooting for Wednesday next week.

Monday, July 5, 2010

Work on a Holiday

This weekend, we took a few days off and went to Washington, DC to visit our friends Rex, Yilei, and their son Ben.  The highlight of the trip was eating a 21-course dinner at Volt (Top Chef's Bryan Voltaggio's restaurant).  We also did a whirlwhind visit of the major DC sites...since Jennifer hasn't been back since 8th grade!  Anxious to get back to monitor the construction, we flew back early on Sunday, July 4th.  Good thing the contractors don't work on Sunday or we would've gone from the airport straight there.  Instead, we were able to enjoy the day at a bbq with Emerson's family for lunch and a bbq with Jen's family for dinner.  We've been so busy with our own stuff for the last few months, so it was great to catch up with everyone.

We had the "day off" from our day-jobs today, so that gave us time to check out the job site later in the day (which meant sleeping past 6:15am).  Emerson was very glad to see the contractors working on a holiday!  He spent the morning contacting electricians since we'll need one this week to put a grounding wire in the ground before we do the 2nd concrete pour (hopefully this Friday or next Tuesday.)  We had Stan the plumber do some initial work before the first pour, and we hope to make a final decision on the rest of the plumbing work this week.  This week we also made a decision on which steel guy to go with as well.  Looks like the foundation work is a few days ahead of schedule which means we have to get all our other ducks in a row quickly.

Getting ready for the second concrete pour...
(That's the drain for the shower sticking out that we had our plumber put in right before pouring the concrete)
North Wall
\
South Wall